Hornsdale Wind Farm - South Australia
5 Jun 2016 3:48 PM

Client: CPP (Consolidated Power Projects)Project Type: Wind Farm Marais provided the installation of 53km of fiber optic, electric and earth c...

Bauma 2016
17 Apr 2016 3:29 PM

We are delighted to announce that we will be attending Bauma 2016, which will take place in Munich between 11th and 17th April 2016.  Followi...

ULTRA BROADBAND FORUM 2015
8 Sep 2015 11:39 AM

The UBBF (Ultra Broadband Forum) 2015, organized by the Chinese giant Huawei from 8 to 9 September 2015 in Madrid, will explore the new frontiers...

Visit SA MARAIS GROUP website on www.samarais.com


Visit TESMEC GROUP website on www.tesmec.com

Pipeline

Effective pipeline solutions are another important offering from Marais Laying Technologies. Generally, we use our SMC Wheel Trencher to lay 1 pipe and 1 fiber optic cable as demonstrated in the Dingo Gas Field project. 

Example of the trench section used to lay different technologies of pipes
Example of the trench section used to lay different technologies of pipes

It is common for customers to have varying requirements when it comes to the materials used for the pipelines they are laying. During the Dingo Gas Field project, for example, a pipeline from FIBERSPAR in glass fiber (See picture below) was used. Another popular choice is HDPE (high density polyethylene pipeline) due to it being more flexible. The team at Marais can advise you on the best solution and machinery to deliver the best results for your specific project.

Safety and cost effectiveness are also important considerations when finding the right solution. A Marais pipeline solution includes: 

  • Simultaneous installation of other services (FO)
  • Simultaneous installation of cable protection and/or warning tap
  • Backfilling with thermally tested and/or excavated material
  • Minimum open trenching risks
  • Between 300 to 4,000 lm/day



What is particularly impressive about the Marais solution is the cable gathering we use for mechanical laying projects. It consists of gathering several cables and fastening them step by step before laying, as demonstrated in the images below.

For innovative cable laying technology, trenching solutions and project management that meets any challenge throughout Australia and New Zealand, contact Marais Laying Technologies today

We build tomorrow’s networks