Client: CPP (Consolidated Power Projects)Project Type: Wind Farm Marais provided the installation of 53km of fiber optic, electric and earth c...

Bauma 2016
17 Apr 2016 3:29 PM

We are delighted to announce that we will be attending Bauma 2016, which will take place in Munich between 11th and 17th April 2016.  Followi...

ULTRA BROADBAND FORUM 2015
8 Sep 2015 11:39 AM

The UBBF (Ultra Broadband Forum) 2015, organized by the Chinese giant Huawei from 8 to 9 September 2015 in Madrid, will explore the new frontiers...

Visit SA MARAIS GROUP website on www.samarais.com


Visit TESMEC GROUP website on www.tesmec.com

Hornsdale Wind Farm - South Australia

5 Jun 2016 3:48 PM - Hornsdale wind farm

Client: CPP (Consolidated Power Projects)

Project Type: Wind Farm

Marais provided the installation of 53km of fiber optic, electric and earth cables over a four-month period at Hornsdale Wind Farm (SA), using 1 x Marais Trencher (SM).  

The electricity generated from each wind turbine will be transmitted via underground cable or overhead transmission line to a central cable marshalling point at the onsite substation, which will be located next to the 275kV power line that runs through the site area. The substation will then connect directly into the National Electricity Transmission Grid. The connecting 275kV lines are owned and operated by ElectraNet and are used to provide a secure transmission link between Port Augusta and the Adelaide Metropolitan Area. The power generated from the Hornsdale Wind Farm will flow into the national interconnected network.

The new power line was constructed on concrete poles – and between February and May 2016, Marais Laying Technologies - along with our 1 SMC200R Marais trencher - worked alongside Consolidated Power Projects to complete this $3.16 million dollar project.

Client: http://www.conpower.com.au

Marais Equipment: Trencher (SM)

Value: AU$3.16 Million