Latest news

< >
AUSTRALIAN CLEAN ENERGY SUMMIT 2017
24 Mar 2017 12:27 PM

AUSTRALIAN CLEAN ENERGY SUMMIT 2017 The Australian Clean Energy Summit is the premier and the most prestigious event helping to lead Australia'...

WIND INDUSTRY FORUM 2017
17 Mar 2017 12:08 PM

WIND INDUSTRY FORUM 2017 The Clean Energy Council's annual Wind Industry Forum is Australia's premier technical event for the wind industry, a...

Hornsdale Wind Farm - South Australia
5 Jun 2016 3:48 PM

Client: CPP (Consolidated Power Projects)Project Type: Wind Farm Marais provided the installation of 53km of fiber optic, electric and earth c...

Bauma 2016
17 Apr 2016 3:29 PM

We are delighted to announce that we will be attending Bauma 2016, which will take place in Munich between 11th and 17th April 2016.  Followi...

ULTRA BROADBAND FORUM 2015
8 Sep 2015 11:39 AM

The UBBF (Ultra Broadband Forum) 2015, organized by the Chinese giant Huawei from 8 to 9 September 2015 in Madrid, will explore the new frontiers...

Visit SA MARAIS GROUP website on www.samarais.com


Visit TESMEC GROUP website on www.tesmec.com

Poseidon Process

The Poseidon process sails a barge along the surface of the water to tow the necessary equipment for the opening of the trench on the riverbed, using a track-mounted carrier with a vibrating ploughshare or trenching wheel.

It is an environmentally friendly solution that allows a simultaneous mechanical laying of cables or ducts whilst ensuring the natural restoration of the riverbed. 

More about the Poseidon process: 

  • Allows a cutting depth of up to 1110mm for the cutting wheel and 1300mm depth with a vibrating ploughshare
  • Has a cutting width of up to 250mm using the cutting wheel and 90mm width with a vibrating ploughshare. 

We build tomorrow’s networks